15:29 IST
BSE
New Order Win
Patel Engineering Bags ₹126.4 Cr Order
Patel Engineering received a ₹126.37 crore LOA for the Tasgaon Lift Irrigation Scheme. The 48-month project strengthens its order book in irrigation infrastructure.
- Value
- ₹126.4 Cr
- Execution
- 48 months