10:52 IST
BSE
New Order WinDilip Buildcon Ltd DBL
Dilip Buildcon Bags ₹688.2 Cr Order from National Highways Authority of India
Dilip Buildcon received a Rs. 688.23 Crore LOA from NHAI for a 9.66 km Solapur elevated corridor. Construction spans 24 months with a 15-year operation period.
- Value
- ₹688.2 Cr
- From
- National Highways Authority of India
- Execution
- 24 Months (construction) + 15 years (operation from COD)
- elevated corridor length
- 9.66 km