BSE filing, NSE: SHANTIGOLD. Summary written from the filing by ALFA Finder's alert engine.
Shanti Gold International Ltd: key numbers
- Share price
- ₹331.85
- Market cap
- ₹2,547 Cr
- Revenue (annual)
- ₹2,019 Cr
- Net profit (annual)
- ₹140.2 Cr
- P/E (TTM)
- 13.7×Sector 49.0×
- Promoter holding
- 70.35%-4.54% QoQ
- FII holding
- 2.22%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Shanti Gold International Ltd
All →Shanti Gold International Board Meeting Date
Shanti Gold will hold a board meeting on November 3, 2026 to consider unaudited results. The trading window remains closed until 48 hours after results.
Shanti Gold International Other Announcement
Shanti Gold International Ltd submitted its quarterly shareholding pattern for the period ended 30 September 2026. This is a standard regulatory compliance filing.
Shanti Gold International Annual General Meeting
Shanti Gold International Ltd held its 13th Annual General Meeting on September 28, 2026. The meeting transacted ordinary business and special business resolutions.
Shanti Gold International Acquisition Worth ₹8.83 Cr
Shanti Gold International Ltd invested Rs. 8.83 Crore to acquire a 0.37% stake (2,65,000 shares) in Ratnaveer Precision Engineering Limited via the secondary market.
- Value
- ₹8.83 Cr
Shanti Gold International Results Correction
Shanti Gold clarified that identical standalone and consolidated Q1 FY27 results resulted from its inactive Dubai subsidiary. The company confirmed Reg 33 and Schedule III compliance.
Shanti Gold International Annual General Meeting
Shanti Gold International Limited has scheduled its 13th Annual General Meeting for September 28, 2026. The meeting will address financial statement adoption and director re-appointment.
Other production started announcements
All →NTPC Green Energy Production Started
NTPC Green Energy's subsidiary declared commercial operations for 95.6 MW of its Kalasar Solar Energy Project effective October 30, 2026.
- solar capacity
- 95.6 MW
NTPC Production Started
NTPC's subsidiary NVVN declared its first 250 MW / 500 MWh BESS project commercial from 27 October 2026, with power scheduling starting 28 October. This is a commercial operation start for a new energy storage asset.
- battery energy storage capacity
- 250.0 MW
DCM Shriram Production Started
DCM Shriram announced full commissioning of its ~68 MW wind-solar hybrid renewable power project. The project is held through SPV JSW Renew Energy Thirty Two Limited.
- wind-solar hybrid renewable power capacity
- 68.0 MW
Subros Production Started
Subros commenced commercial production at its new greenfield HVAC and Hose & Tubes plant. The 4.5 lakh units/annum capacity required ₹150 Crore investment.
- Value
- ₹150.0 Cr
- HVAC and Hose & Tubes / air-conditioning system production capacity
- 450000 units per annum
Precision Wires India Production Started
Precision Wires India commenced commercial production of copper cathodes at its Zaroli, Gujarat refining facility. No capacity or investment value was disclosed.
EPack Prefab Technologies Production Started
EPACK Prefab commenced commercial production at its Ghiloth, Rajasthan facility effective October 28, 2026, adding 11,300 MT/annum of PEB capacity and 8,00,000 sq m/annum of PUF capacity. The project cost of around INR 100 Crore is not treated as an event value.
- PEB structures manufacturing capacity
- 11300.0 MT/annum