| Value | ₹27.34 Cr |
|---|
BSE filing, BSE: 544498. Summary written from the filing by ALFA Finder's alert engine.
Oval Projects Engineering Ltd: key numbers
- Share price
- ₹42.00
- Market cap
- ₹87.23 Cr
- Revenue (annual)
- ₹149.9 Cr
- Net profit (annual)
- ₹13.72 Cr
- P/E (TTM)
- 6.4×Sector 33.4×
- Promoter holding
- 53.14%
- FII holding
- 0.82%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Oval Projects Engineering Ltd
All →Oval Projects Engineering Merger & Restructuring Worth ₹0.03 Cr
Oval Projects will form a 50:50 joint venture, Oval Eiko Resources, with Eiko Scientific Solutions LLP for biogas. Cash consideration is Rs.0.03 Crore; incorporation is pending.
- Value
- ₹0.03 Cr
Oval Projects Engineering Merger & Restructuring
Oval Projects Engineering will form a 50:50 joint venture with Eiko Scientific Solutions LLP for renewable energy. The board also deferred a warrant fundraise to a later meeting.
Oval Projects Engineering Results Update
Oval Projects Engineering Ltd reported a 16.01% YoY revenue growth to ₹70.72 Crore for H1 FY27. EBITDA rose 10.29% to ₹13.60 Crore despite a slight PAT decline.
Oval Projects Engineering Other Announcement
Oval Projects Engineering Limited has re-appointed Mr. Krishna Kumar Singh as the Secretarial Auditor of the company. The decision was finalized during the board meeting held on April 11, 2026.
Oval Projects Engineering Financial Results
Oval Projects approved half-year results and deferred its warrant issue. It also approved forming a joint venture with EIKO Scientific Solutions LLP.
Oval Projects Engineering H1 FY27 Results: Net Profit ₹6.3 Cr, Down 1.6% YoY
Oval Projects Engineering Ltd reported revenue from operations of ₹70.7 Cr (+15.9% YoY) and net profit of ₹6.3 Cr (-1.6% YoY) for H1 FY27.
- Key figure
- Net profit ₹6.3 Cr · -1.6% YoY
Other new order win announcements
All →Seamec Bags ₹245.7 Cr Order from Larsen & Toubro Limited
Seamec won a Letter of Award from L&T for ONGC's PRP-X subsea work, its scope worth about ₹245.72 crore. Work completes by May 2027.
- Value
- ₹245.7 Cr
- From
- Larsen & Toubro Limited (L&T Energy Hydrocarbon Division)
- Execution
- Work to be completed by May 2027
Shree Refrigerations Bags ₹26.44 Cr Order from Garden Reach Shipbuilders & Engineers Limited
Shree Refrigerations secured a Rs 26.44 Crore defence order from Garden Reach Shipbuilders for specialised refrigeration components. Delivery is due by 5 July 2027.
- Value
- ₹26.44 Cr
- From
- Garden Reach Shipbuilders & Engineers Limited
- Execution
- Delivery by 05 July 2027
Time Technoplast Bags ₹35 Cr Order from Methanol Chemicals Company, Saudi Arabia
Time Technoplast's Saudi subsidiary won an exclusive one-year supply contract worth Rs. 35 Crore (USD 3.68 Million) from Methanol Chemicals Company (CHEMANOL). The order covers industrial packaging products such as drums, jerry cans and IBCs.
- Value
- ₹35.00 Cr
- From
- Methanol Chemicals Company (CHEMANOL), Saudi Arabia
- Execution
- Within one year
Bharat Heavy Electricals Bags ₹600 Cr Order from Power Grid Corporation of India Limited, on behalf of its Project...
BHEL received an order from Power Grid Corporation of India on behalf of its project SPV for two synchronous condensers at Barmer-II HVDC terminal. The order is valued at Rs 600-900 Cr excluding GST and must be executed within 44 months.
- Value
- ₹600.0 Cr
- From
- Power Grid Corporation of India Limited, on behalf of its Project SPV Company
- Execution
- 44 months
Power Mech Projects Bags ₹489.9 Cr Order from Joint Venture of Elsewedy Electric Power Systems Projects and...
Power Mech Projects' Saudi subsidiary won an international erection contract from an Elsewedy Electric and Sinohydro joint venture for the Rabigh 2 IPP Expansion, with aggregate value of about USD 52.1 million (~INR 492 Crore). The contract runs 20 months from January 2027.
- Value
- ₹489.9 Cr
- From
- Joint Venture of Elsewedy Electric Power Systems Projects (Branch) and Sinohydro Corporation Limited (Branch), for the Rabigh 2 IPP Expansion Project
- Execution
- 20 months effective from January 1, 2027
RMC Switchgears Bags ₹3.94 Cr Order from M.P. Poorv Kshetra Vidhyut Vitraran Co. Ltd.
RMC Switchgears won a ₹3.94 Crore LOA from MP Poorv Kshetra Vidhyut Vitraran for LT distribution boxes. Execution is due over 36 months.
- Value
- ₹3.94 Cr
- From
- M.P. Poorv Kshetra Vidhyut Vitraran Co. Ltd.
- Execution
- 36 Months