Thursday, 29 October 2026 Every NSE & BSE announcement, by company
ALFA Filings Every announcement, straight from the exchange
New Order Win

Oriental Rail Infrastructure Bags ₹4.76 Cr Order from Integral Coach Factory, Chennai, Indian Railways

Oriental Rail Infrastructure secured a Rs. 4.76 Crore order from Integral Coach Factory for manufacturing and supplying 50 coach sets of seats and berths.

Key figures
Value₹4.76 Cr
Order fromIntegral Coach Factory (ICF), Chennai, Indian Railways
Execution periodDecember 31, 2026
coach sets of seats & berths50.0 sets
Source

BSE filing, NSE: ORIRAIL. Summary written from the filing by ALFA Finder's alert engine.

Read the filing ↗

Oriental Rail Infrastructure Ltd: key numbers

Share price
₹115.20
Market cap
₹743.7 Cr
Revenue (annual)
₹573.4 Cr
Net profit (annual)
₹42.24 Cr
P/E (TTM)
14.4×Sector 52.2×
Promoter holding
57.69%+0.00% QoQ
FII holding
0.10%Current quarter

Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.

More from Oriental Rail Infrastructure Ltd

All →
17:51 IST BSE
New Order Win

Oriental Rail Infrastructure Bags ₹630.6 Cr Order from Ministry of Railways, Indian Railways

Oriental Rail Infrastructure received a Ministry of Railways order to manufacture and supply 1,560 BOXNS wagons. The order is valued at about ₹630.61 Crore, inclusive of GST.

Value
₹630.6 Cr
From
Ministry of Railways (Railway Board), Indian Railways
Execution
Delivery period for the additional 360 BOXNS wagons up to June 11, 2027; the core 1,560-wagon supply period is not separately stated

Other new order win announcements

All →
10:52 IST BSE
New Order WinDilip Buildcon Ltd DBL

Dilip Buildcon Bags ₹688.2 Cr Order from National Highways Authority of India

Dilip Buildcon received a Rs. 688.23 Crore LOA from NHAI for a 9.66 km Solapur elevated corridor. Construction spans 24 months with a 15-year operation period.

Value
₹688.2 Cr
From
National Highways Authority of India
Execution
24 Months (construction) + 15 years (operation from COD)
elevated corridor length
9.66 km
09:02 IST NSE
New Order WinJupiter Wagons Ltd JWL

Jupiter Wagons Bags ₹1,140 Cr Order from Ministry of Railways

Jupiter Wagons secured an order for 2,583 BOXNHL and BOXNS wagons worth ₹1,140 crore from the Ministry of Railways. This reinforces its position in railway rolling stock manufacturing.

Value
₹1,140 Cr
From
Ministry of Railways (Railway Board)
00:34 IST BSE
New Order WinACME Solar Holdings Ltd ACMESOLAR

ACME Solar Holdings Bags New Order from NTPC Limited

ACME Solar's subsidiary signed a PPA with NTPC for a 400 MW FDRE project. Supply is scheduled to start by June 2028, with a 25-year tenure.

From
NTPC Limited
Execution
Scheduled Commencement of Supply Date 30.06.2028; project tenure 25 years from SCSD
FDRE power project contracted capacity
400.0 MW