| Value | ₹0.13 Cr |
|---|---|
| Execution period | 60 Months |
NSE filing, NSE: MARC. Summary written from the filing by ALFA Finder's alert engine.
Marc Technocrats Ltd: key numbers
- Share price
- ₹153.00
- Market cap
- ₹264.9 Cr
- Revenue (annual)
- ₹69.73 Cr
- Net profit (annual)
- ₹10.56 Cr
- P/E (TTM)
- 25.1×Sector 43.1×
- Promoter holding
- 73.55%+0.00% QoQ
- FII holding
- 3.76%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Marc Technocrats Ltd
All →Marc Technocrats Other Announcement
Marc Technocrats Limited submitted its quarterly shareholding pattern for the quarter ended September 30, 2026, as required by SEBI Regulation 31(1)(b).
Marc Technocrats Bags ₹1.74 Cr Order from Eklavya - HSG - DKY JV
Marc Technocrats Limited received a Rs. 1.74 Crore project management consultancy order for bridge construction. The project will be executed over 12 months.
- Value
- ₹1.74 Cr
- From
- Eklavya - HSG - DKY JV
- Execution
- 12 Months
Marc Technocrats Bags ₹1.75 Cr Order from Eklavya – HSG – DKY “JV”
Marc Technocrats Ltd received a ₹1.75 Crore Project Management Consultancy order from Eklavya – HSG – DKY “JV”. The project will be executed over 12 months.
- Value
- ₹1.75 Cr
- From
- Eklavya – HSG – DKY “JV”
- Execution
- 12 months
Marc Technocrats Bags ₹1.5 Cr Order
Marc Technocrats Limited secured a Rs. 1.50 Crore consultancy contract from JSP Projects Pvt. Ltd. The project involves pre-bid advisory services over twelve months.
- Value
- ₹1.50 Cr
- Execution
- 12 Months
Marc Technocrats Bags ₹12 Cr Order
Marc Technocrats Limited received a Project Management Contract worth Rs. 12.00 Crore from Pradeepraj Infra Pvt. Ltd. The road rehabilitation project spans 12 months in Maharashtra.
- Value
- ₹12.00 Cr
- Execution
- 12 Months
Marc Technocrats Bags ₹4.5 Cr Order
Marc Technocrats Limited has been awarded a project by NHAI for Independent Engineer Services. The contract is valued at Rs.4.50 Crore, spanning 48 months.
- Value
- ₹4.50 Cr
- Execution
- 48 Months
Other new order win announcements
All →Prime Cable Industries Bags ₹12.98 Cr Order from Reputed listed EPC
Prime Cable Industries received a ₹12.98 Crore purchase order from a listed EPC for LT cable supply. Execution is due in 6 months; no related-party interest.
- Value
- ₹12.98 Cr
- From
- Reputed listed EPC (unnamed)
- Execution
- 6 Months
Siyaram Recycling Industries Bags ₹3.09 Cr Order from Sahjanand Impex
Siyaram Recycling secured a Rs. 3.09 Crore order from Sahjanand Impex for Brass Scrap Honey. Execution is due within 20 days.
- Value
- ₹3.09 Cr
- From
- Sahjanand Impex
- Execution
- Within 20 Days
RailTel Corporation of India Bags ₹22.78 Cr Order from Department Of Posts
RailTel received a Letter of Acceptance from Department of Posts for GPU Compute and Storage services. The Rs. 22.78 Crore order covers a 5-year OPEX execution period.
- Value
- ₹22.78 Cr
- From
- Department Of Posts
- Execution
- 5 years
Dilip Buildcon Bags ₹688.2 Cr Order from National Highways Authority of India
Dilip Buildcon received a Rs. 688.23 Crore LOA from NHAI for a 9.66 km Solapur elevated corridor. Construction spans 24 months with a 15-year operation period.
- Value
- ₹688.2 Cr
- From
- National Highways Authority of India
- Execution
- 24 Months (construction) + 15 years (operation from COD)
- elevated corridor length
- 9.66 km
Jupiter Wagons Bags ₹1,140 Cr Order from Ministry of Railways
Jupiter Wagons secured an order for 2,583 BOXNHL and BOXNS wagons worth ₹1,140 crore from the Ministry of Railways. This reinforces its position in railway rolling stock manufacturing.
- Value
- ₹1,140 Cr
- From
- Ministry of Railways (Railway Board)
ACME Solar Holdings Bags New Order from NTPC Limited
ACME Solar's subsidiary signed a PPA with NTPC for a 400 MW FDRE project. Supply is scheduled to start by June 2028, with a 25-year tenure.
- From
- NTPC Limited
- Execution
- Scheduled Commencement of Supply Date 30.06.2028; project tenure 25 years from SCSD
- FDRE power project contracted capacity
- 400.0 MW