| Value | ₹118.0 Cr |
|---|---|
| Order from | Maharashtra State Electricity Distribution Company Limited (MSEDCL) |
| Execution period | 60 days |
| solar photovoltaic pumping systems | 5000 solar pumps |
NSE filing, NSE: JISLJALEQS. Summary written from the filing by ALFA Finder's alert engine.
Jain Irrigation Systems Ltd: key numbers
- Share price
- ₹23.95
- Market cap
- ₹1,711 Cr
- Revenue (annual)
- ₹6,400 Cr
- Net profit (annual)
- ₹-24.61 Cr
- P/E (TTM)
- -32.0×Sector 52.2×
- Promoter holding
- 26.68%+0.00% QoQ
- FII holding
- 2.13%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Jain Irrigation Systems Ltd
All →Jain Irrigation Systems Board Meeting Date
Jain Irrigation Systems will hold a board meeting on 04 Nov 2026 to consider unaudited standalone and consolidated half-yearly results for September 2026. Trading window closes from 01 Oct to 06 Nov 2026.
Jain Irrigation Systems Bags New Order from Supercritical
Jain Irrigation signed a Supercritical deal for up to 19,000 tonnes of biochar credits (2026-27). The deal monetises its Jalgaon facility via a carbon removal marketplace.
- From
- Supercritical
- Execution
- 2026-2027
- biochar carbon removal credits
- 19000 tonnes
Jain Irrigation Systems Other Announcement
The company submitted its quarterly shareholding pattern for the period ended September 30, 2026, as required under SEBI regulations. This is a periodic compliance filing.
Jain Irrigation Systems Credit Rating
Jain Irrigation Systems Limited informed the exchange that CRISIL Ratings reaffirmed ratings on bank facilities and NCDs, while withdrawing ratings on specific redeemed instruments.
Jain Irrigation Systems Price Movement Clarification
Jain Irrigation confirmed no new price-sensitive information beyond recent disclosures. The response addresses NSE's query on unusual trading volume in the company's shares.
Jain Irrigation Systems Other Announcement
Jain Irrigation Systems Limited held its first meeting of Independent Directors for FY 2026-27 on September 30, 2026. The meeting was conducted via video conferencing without management presence.
Other new order win announcements
All →Prime Cable Industries Bags ₹12.98 Cr Order from Reputed listed EPC
Prime Cable Industries received a ₹12.98 Crore purchase order from a listed EPC for LT cable supply. Execution is due in 6 months; no related-party interest.
- Value
- ₹12.98 Cr
- From
- Reputed listed EPC (unnamed)
- Execution
- 6 Months
Siyaram Recycling Industries Bags ₹3.09 Cr Order from Sahjanand Impex
Siyaram Recycling secured a Rs. 3.09 Crore order from Sahjanand Impex for Brass Scrap Honey. Execution is due within 20 days.
- Value
- ₹3.09 Cr
- From
- Sahjanand Impex
- Execution
- Within 20 Days
RailTel Corporation of India Bags ₹22.78 Cr Order from Department Of Posts
RailTel received a Letter of Acceptance from Department of Posts for GPU Compute and Storage services. The Rs. 22.78 Crore order covers a 5-year OPEX execution period.
- Value
- ₹22.78 Cr
- From
- Department Of Posts
- Execution
- 5 years
Dilip Buildcon Bags ₹688.2 Cr Order from National Highways Authority of India
Dilip Buildcon received a Rs. 688.23 Crore LOA from NHAI for a 9.66 km Solapur elevated corridor. Construction spans 24 months with a 15-year operation period.
- Value
- ₹688.2 Cr
- From
- National Highways Authority of India
- Execution
- 24 Months (construction) + 15 years (operation from COD)
- elevated corridor length
- 9.66 km
Jupiter Wagons Bags ₹1,140 Cr Order from Ministry of Railways
Jupiter Wagons secured an order for 2,583 BOXNHL and BOXNS wagons worth ₹1,140 crore from the Ministry of Railways. This reinforces its position in railway rolling stock manufacturing.
- Value
- ₹1,140 Cr
- From
- Ministry of Railways (Railway Board)
ACME Solar Holdings Bags New Order from NTPC Limited
ACME Solar's subsidiary signed a PPA with NTPC for a 400 MW FDRE project. Supply is scheduled to start by June 2028, with a 25-year tenure.
- From
- NTPC Limited
- Execution
- Scheduled Commencement of Supply Date 30.06.2028; project tenure 25 years from SCSD
- FDRE power project contracted capacity
- 400.0 MW