| Value | ₹2.60 Cr |
|---|---|
| solar power capacity | 8.0 MWp |
BSE filing, NSE: GRPLTD. Summary written from the filing by ALFA Finder's alert engine.
GRP Ltd: key numbers
- Share price
- ₹1,928.70
- Market cap
- ₹1,029 Cr
- Revenue (annual)
- ₹535.3 Cr
- Net profit (annual)
- ₹3.22 Cr
- P/E (TTM)
- 102.0×Sector 30.9×
- Promoter holding
- 40.05%+0.00% QoQ
- FII holding
- 0.01%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from GRP Ltd
All →GRP Investor Presentation: Key Takeaways
Q2 FY27 consolidated total income Rs1,727 Mn (+30%), EBITDA Rs182 Mn (+60%), PAT Rs64 Mn (+226%); H1 income +28%. Reclaim rubber scaling.
GRP Q2 FY27 Results: Net Profit ₹6.4 Cr, Up 220.0% YoY
GRP Ltd reported revenue from operations of ₹172.3 Cr (+30.1% YoY) and net profit of ₹6.4 Cr (+220.0% YoY) for Q2 FY27.
- Key figure
- Net profit ₹6.4 Cr · +220.0% YoY
GRP Board Meeting Date
GRP Ltd has scheduled a Board meeting on 28 October 2026 to consider Q2/H2 unaudited results. The trading window remains closed until 30 October 2026.
GRP Other Announcement
GRP Ltd has filed its quarterly shareholding pattern for the period ended September 30, 2026, as per regulatory requirements.
GRP Other Announcement
GRP Ltd has submitted the quarterly confirmation certificate under Regulation 74(5) of SEBI (Depositories and Participants) Regulations, 2018 for the period ended 30th September 2026.
GRP Merger & Restructuring Worth ₹2.6 Cr
GRP Ltd invested ₹2.60 Crore to acquire a 26.43% stake in BECIS Solar 5 Private Limited. This acquisition facilitates captive solar power procurement for the company.
- Value
- ₹2.60 Cr
Other production started announcements
All →Waaree Energies Production Started
Waaree Solar Americas commenced commercial production of 1.6 GW solar modules at Brookshire, Texas. Total facility capacity now stands at 3.2 GW.
- solar module manufacturing capacity
- 1600 MW
Studds Accessories Production Started
Studds Accessories commenced commercial production at its Manufacturing Facility-V in Faridabad on October 30, 2026, after receiving Consent to Operate. No capacity or monetary value was disclosed.
NTPC Green Energy Production Started
NTPC Green Energy's subsidiary declared commercial operations for 95.6 MW of its Kalasar Solar Energy Project effective October 30, 2026.
- solar capacity
- 95.6 MW
NTPC Production Started
NTPC's subsidiary NVVN declared its first 250 MW / 500 MWh BESS project commercial from 27 October 2026, with power scheduling starting 28 October. This is a commercial operation start for a new energy storage asset.
- battery energy storage capacity
- 250.0 MW
DCM Shriram Production Started
DCM Shriram announced full commissioning of its ~68 MW wind-solar hybrid renewable power project. The project is held through SPV JSW Renew Energy Thirty Two Limited.
- wind-solar hybrid renewable power capacity
- 68.0 MW
Subros Production Started
Subros commenced commercial production at its new greenfield HVAC and Hose & Tubes plant. The 4.5 lakh units/annum capacity required ₹150 Crore investment.
- Value
- ₹150.0 Cr
- HVAC and Hose & Tubes / air-conditioning system production capacity
- 450000 units per annum