BSE filing, NSE: EKC. Summary written from the filing by ALFA Finder's alert engine.
Everest Kanto Cylinder Ltd: key numbers
- Share price
- ₹98.02
- Market cap
- ₹1,100 Cr
- Revenue (annual)
- ₹1,471 Cr
- Net profit (annual)
- ₹146.8 Cr
- P/E (TTM)
- 8.8×Sector 52.2×
- Promoter holding
- 67.39%+0.00% QoQ
- FII holding
- 1.20%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Everest Kanto Cylinder Ltd
All →Everest Kanto Cylinder Production Started
Everest Kanto Cylinder's subsidiary EKC Egypt has begun commercial CNG cylinder dispatches following commencement of production. The unit is the first in Egypt and Africa to produce CNG cylinders locally.
Everest Kanto Cylinder Other Announcement
The company filed its quarterly shareholding pattern as mandated by SEBI regulations. This periodic disclosure updates the distribution of equity ownership among various investor categories.
Everest Kanto Cylinder Annual General Meeting
Everest Kanto Cylinder Limited held its 47th Annual General Meeting on September 29, 2026. Shareholders considered a final dividend of ₹0.70 per equity share for FY26.
Everest Kanto Cylinder Credit Rating
CARE Ratings reaffirmed Everest Kanto Cylinder Ltd's long-term rating at CARE A- with a stable outlook. The short-term rating was also reaffirmed at CARE A2+.
Everest Kanto Cylinder Credit Rating
CARE Ratings reaffirmed Everest Kanto Cylinder's long-term rating at 'CARE A-; Stable' and short-term rating at 'CARE A2+'. The ratings cover facilities totaling ₹219.84 Crore.
- Value
- ₹219.8 Cr
Everest Kanto Cylinder Management Change
Everest Kanto Cylinder Limited announced the discontinuation of services of HR Head Mr. Amitkumar C. Choksi, effective from the close of working hours on September 22, 2026.
Other production started announcements
All →EPack Prefab Technologies Production Started
EPACK Prefab commenced commercial production at its Ghiloth, Rajasthan facility effective October 28, 2026, adding 11,300 MT/annum of PEB capacity and 8,00,000 sq m/annum of PUF capacity. The project cost of around INR 100 Crore is not treated as an event value.
- PEB structures manufacturing capacity
- 11300.0 MT/annum
Zelio E-Mobility Production Started
Zelio E-Mobility began commercial production at its new Patan, Hisar plant on October 28, 2026. The plant adds 72,000 annual units of two- and three-wheeler capacity.
- manufacturing capacity (two- and three-wheelers)
- 72000.0 units per annum
Subros Production Started
Subros started commercial production at its new Kharkhoda greenfield plant on 28 October 2026. The plant adds 4.5 lakh units per annum of HVAC and hose capacity.
- HVAC and hose & tubes manufacturing capacity
- 4.5 lakh units per annum
ACME Solar Holdings Production Started
ACME Solar's subsidiary commissioned 35.77 MW/143.08 MWh of BESS capacity, bringing cumulative commissioned capacity to 195.35 MW/781.40 MWh. Commercial operation is scheduled for October 29, 2026.
- BESS discharge capacity commissioned
- 35.77 MW
Kalana Ispat Production Started
Kalana Ispat has commenced commercial production of alloy steel round bars at its new Khengaria rolling mill. The mill has an annual capacity of about 65,000 MT.
- alloy steel rolling mill capacity
- 0.065 MTPA
Jainik Power Cables Production Started
Jainik Power Cables commissioned a 400 kW solar plant at its Sonipat facility in October 2026. The installation supports energy efficiency and its ESR sustainability commitments.
- solar power plant capacity
- 400 kW