Thursday, 29 October 2026 Every NSE & BSE announcement, by company
ALFA Filings Every announcement, straight from the exchange
New Order Win

East India Drums and Barrels Manufacturing Bags ₹59.02 Cr Order from Hindustan Petroleum Corporation Ltd

East India Drums & Barrels Mfg. Ltd has secured a contract from Hindustan Petroleum Corporation Ltd worth ₹59.02 Crore for supplying bitumen drums over two years.

Key figures
Value₹59.02 Cr
Order fromHindustan Petroleum Corporation Ltd
Execution period2 years
Source

BSE filing, BSE: 523874. Summary written from the filing by ALFA Finder's alert engine.

Read the filing ↗

East India Drums and Barrels Manufacturing Ltd: key numbers

Share price
₹96.80
Market cap
₹143.0 Cr
Revenue (annual)
₹248.2 Cr
Net profit (annual)
₹4.67 Cr
P/E (TTM)
30.1×Sector 52.2×
Promoter holding
75.00%-19.68% QoQ
FII holding
0.00%Current quarter

Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.

More from East India Drums and Barrels Manufacturing Ltd

All →

Other new order win announcements

All →
10:52 IST BSE
New Order WinDilip Buildcon Ltd DBL

Dilip Buildcon Bags ₹688.2 Cr Order from National Highways Authority of India

Dilip Buildcon received a Rs. 688.23 Crore LOA from NHAI for a 9.66 km Solapur elevated corridor. Construction spans 24 months with a 15-year operation period.

Value
₹688.2 Cr
From
National Highways Authority of India
Execution
24 Months (construction) + 15 years (operation from COD)
elevated corridor length
9.66 km
09:02 IST NSE
New Order WinJupiter Wagons Ltd JWL

Jupiter Wagons Bags ₹1,140 Cr Order from Ministry of Railways

Jupiter Wagons secured an order for 2,583 BOXNHL and BOXNS wagons worth ₹1,140 crore from the Ministry of Railways. This reinforces its position in railway rolling stock manufacturing.

Value
₹1,140 Cr
From
Ministry of Railways (Railway Board)
00:34 IST BSE
New Order WinACME Solar Holdings Ltd ACMESOLAR

ACME Solar Holdings Bags New Order from NTPC Limited

ACME Solar's subsidiary signed a PPA with NTPC for a 400 MW FDRE project. Supply is scheduled to start by June 2028, with a 25-year tenure.

From
NTPC Limited
Execution
Scheduled Commencement of Supply Date 30.06.2028; project tenure 25 years from SCSD
FDRE power project contracted capacity
400.0 MW