| Value | ₹43.26 Cr |
|---|---|
| Execution period | 31.07.2026 |
BSE filing, NSE: DIACABS. Summary written from the filing by ALFA Finder's alert engine.
Diamond Power Infrastructure Ltd: key numbers
- Share price
- ₹341.65
- Market cap
- ₹20,433 Cr
- Revenue (annual)
- ₹1,910 Cr
- Net profit (annual)
- ₹158.2 Cr
- P/E (TTM)
- 104.0×Sector 42.1×
- Promoter holding
- 74.03%-9.99% QoQ
- FII holding
- 4.14%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Diamond Power Infrastructure Ltd
All →Diamond Power Infrastructure Board Meeting Date
Diamond Power scheduled a board meeting for 3 November 2026 to consider unaudited quarterly results. Trading window stays closed until 48 hours after declaration.
Diamond Power Infrastructure Capacity Expansion: ₹25 Cr Investment
DICABS will add a CCV line for 132 kV cables at its Vadodara plant at Rs 25 crore cost. Commissioning targeted by December 2027 via internal accruals.
- Value
- ₹25.00 Cr
- Execution
- Commissioning by December 31, 2027
- CCV line for cables up to 132 kV
- 1 CCV lines
Diamond Power Infrastructure Management Change
Diamond Power Infrastructure Ltd appointed Kundip S. Thakker as CFO and KMP. Pawan Lohiya has been re-designated as Deputy CFO, effective October 20, 2026.
Diamond Power Infrastructure Other Announcement
Diamond Power Infrastructure Limited submitted the Regulation 74(5) certificate for the quarter ended September 30, 2026, confirming compliance with SEBI dematerialization requirements.
Diamond Power Infrastructure Board Meeting Correction
Diamond Power Infrastructure provided additional details regarding the timing of its board meeting held on October 3, 2026. This follows an observation from the BSE exchange.
Diamond Power Infrastructure Management Change
Diamond Power Infrastructure appointed Ashwani Saraf as Chief Operating Officer and Senior Management Personnel, effective October 3, 2026, replacing outgoing COO Kalpesh Patel.
Other new order win announcements
All →ACME Solar Holdings Bags ₹5,000 Cr Order from NTPC Limited
Acme Solar's subsidiary signed a PPA with NTPC for a 400 MW FDRE project worth Rs.5,000 Crore. Supply starts 30 June 2028 for 25 years.
- Value
- ₹5,000 Cr
- From
- NTPC Limited
- Execution
- SCSD 30.06.2028; 25-year project tenure from SCSD
- contracted FDRE capacity
- 400.0 MW
Anawil Wire & Engineering Bags ₹58.32 Cr Order
Anawil Wire and Engineering received an order worth Rs.58,32,42,345 inclusive of GST for 10 steel wind turbine towers. Completion is expected by Q1 FY27-28.
- Value
- ₹58.32 Cr
- Execution
- Expected completion by Q1 FY 27-28
Prime Cable Industries Bags ₹12.98 Cr Order from Reputed listed EPC
Prime Cable Industries received a ₹12.98 Crore purchase order from a listed EPC for LT cable supply. Execution is due in 6 months; no related-party interest.
- Value
- ₹12.98 Cr
- From
- Reputed listed EPC (unnamed)
- Execution
- 6 Months
Siyaram Recycling Industries Bags ₹3.09 Cr Order from Sahjanand Impex
Siyaram Recycling secured a Rs. 3.09 Crore order from Sahjanand Impex for Brass Scrap Honey. Execution is due within 20 days.
- Value
- ₹3.09 Cr
- From
- Sahjanand Impex
- Execution
- Within 20 Days
RailTel Corporation of India Bags ₹22.78 Cr Order from Department Of Posts
RailTel received a Letter of Acceptance from Department of Posts for GPU Compute and Storage services. The Rs. 22.78 Crore order covers a 5-year OPEX execution period.
- Value
- ₹22.78 Cr
- From
- Department Of Posts
- Execution
- 5 years
Dilip Buildcon Bags ₹688.2 Cr Order from National Highways Authority of India
Dilip Buildcon received a Rs. 688.23 Crore LOA from NHAI for a 9.66 km Solapur elevated corridor. Construction spans 24 months with a 15-year operation period.
- Value
- ₹688.2 Cr
- From
- National Highways Authority of India
- Execution
- 24 Months (construction) + 15 years (operation from COD)
- elevated corridor length
- 9.66 km