BSE filing, NSE: COALINDIA. Summary written from the filing by ALFA Finder's alert engine.
Coal India Ltd: key numbers
- Share price
- ₹389.00
- Market cap
- ₹2,39,730 Cr
- Revenue (annual)
- ₹1,68,400 Cr
- Net profit (annual)
- ₹31,094 Cr
- P/E (TTM)
- 7.2×Sector 16.5×
- Promoter holding
- 61.13%+0.00% QoQ
- FII holding
- 9.59%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Coal India Ltd
All →Coal India Investor Presentation: Key Takeaways
Q2 FY27 consolidated PAT ₹6,547 Cr (+57%), revenue ₹44,179 Cr (+21%), EBITDA margin 26%; H1 PAT ₹15,397 Cr (+19%). Production -2% in H1; offtake +8%.
Coal India Dividend
Coal India declared a second interim dividend of Rs 10.25 per share for FY 2026-27 with record date 4 November 2026. Payment will be made by 27 November 2026 through electronic modes only.
Coal India Financial Results
Coal India reported unaudited Q2 and half-year results and declared a ₹10.25 per share second interim dividend. Record date is November 4, 2026.
Coal India Business Update
Coal India spent ₹7,966 crore on capex in H1 FY27, a 27% YoY rise. The outlay achieved 109% of the planned target for the period.
Coal India Board Meeting Date
Coal India will hold a board meeting on 29 October 2026 to consider Q2/H1 2026 results and possible interim dividend. No financial figures are disclosed.
Coal India Other Announcement
Coal India Ltd has submitted its quarterly shareholding pattern for the period ended September 30, 2026. This is a routine periodic regulatory disclosure.
Other production started announcements
All →Waaree Energies Production Started
Waaree Solar Americas commenced commercial production of 1.6 GW solar modules at Brookshire, Texas. Total facility capacity now stands at 3.2 GW.
- solar module manufacturing capacity
- 1600 MW
Studds Accessories Production Started
Studds Accessories commenced commercial production at its Manufacturing Facility-V in Faridabad on October 30, 2026, after receiving Consent to Operate. No capacity or monetary value was disclosed.
NTPC Green Energy Production Started
NTPC Green Energy's subsidiary declared commercial operations for 95.6 MW of its Kalasar Solar Energy Project effective October 30, 2026.
- solar capacity
- 95.6 MW
NTPC Production Started
NTPC's subsidiary NVVN declared its first 250 MW / 500 MWh BESS project commercial from 27 October 2026, with power scheduling starting 28 October. This is a commercial operation start for a new energy storage asset.
- battery energy storage capacity
- 250.0 MW
DCM Shriram Production Started
DCM Shriram announced full commissioning of its ~68 MW wind-solar hybrid renewable power project. The project is held through SPV JSW Renew Energy Thirty Two Limited.
- wind-solar hybrid renewable power capacity
- 68.0 MW
Subros Production Started
Subros commenced commercial production at its new greenfield HVAC and Hose & Tubes plant. The 4.5 lakh units/annum capacity required ₹150 Crore investment.
- Value
- ₹150.0 Cr
- HVAC and Hose & Tubes / air-conditioning system production capacity