Brahmaputra Infrastructure Bags ₹89.73 Cr Order from Office of the Executive Engineer, Construction Division, PWD B&R...
Brahmaputra Infrastructure declared L-1 for a Rs. 89.73 Crore bridge project over River Ravi in Punjab. Execution period is 24 months under the CRIF Scheme.
Value
₹89.73 Cr
From
Office of the Executive Engineer, Construction Division, PWD B&R Branch, Pathankot
Brahmaputra Infrastructure Bags ₹46.63 Cr Order from Northeast Frontier Railway
Brahmaputra Infrastructure signed a Rs.46.63 Crore contract with Northeast Frontier Railway for a Road Over Bridge. Work deadline is August 2027 with a 48-month defect liability period.
Value
₹46.63 Cr
From
Northeast Frontier Railway (Ministry of Railways, Government of India)
Execution
On or before 08.08.2027, plus 48-month defect liability period
Brahmaputra Infrastructure Ltd received a Rs. 11.59 Crore Letter of Acceptance for the repair and renovation of healthcare facilities in Assam. The project spans 12 months.
Brahmaputra Infrastructure Ltd has signed a ₹70.18 Crore maintenance contract with the Ministry of Road Transport & Highways. The five-year project covers the NH-502A corridor in Mizoram.
Brahmaputra Infrastructure Limited has been declared the lowest bidder (L-1) for a Rs. 78.09 Crore project. The contract involves tunnelling and civil works for a power project.