BSE filing, BSE: 543971. Summary written from the filing by ALFA Finder's alert engine.
Bondada Engineering Ltd: key numbers
- Share price
- ₹272.85
- Market cap
- ₹3,047 Cr
- Revenue (annual)
- ₹2,843 Cr
- Net profit (annual)
- ₹203.5 Cr
- P/E (TTM)
- 15.0×Sector 32.2×
- Promoter holding
- 61.52%+0.00% QoQ
- FII holding
- 0.44%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Bondada Engineering Ltd
All →Bondada Engineering Credit Rating
CRISIL upgraded credit ratings for five subsidiaries of Bondada Engineering to A/Stable or A-/Stable. The upgrade reflects strong financials and supports the group's lender credibility.
Bondada Engineering SME to Main Board Migration
Bondada Engineering received NSE listing approval for migration from BSE SME to NSE Main Board. The milestone broadens investor reach and supports long-term growth.
Bondada Engineering Bags ₹219.9 Cr Order from Gujarat Industries Power Company Ltd
Bondada Engineering secured an order worth ₹219.88 Crore from GIPCL for a 20 MW/120 MWh BESS project, to be executed over 18 months.
- Value
- ₹219.9 Cr
- From
- Gujarat Industries Power Company Ltd
- Execution
- 18 months
- BESS capacity
- 20.0 MW
Bondada Engineering Bags New Order from Gujarat Industries Power Company Ltd
Bondada received a GIPCL LOI for a 20 MW/120 MWh Vanadium Redox Flow BESS EPC project at Vadodara. No rupee value disclosed; 18-month completion timeline.
- From
- Gujarat Industries Power Company Ltd (GIPCL)
- Execution
- 18 months from receipt of NOA, plus 10 years O&M
- VRFB BESS power capacity (120 MWh storage)
- 20 MW
Bondada Engineering Other Announcement
The company submitted its quarterly shareholding pattern statement for the period ended September 30, 2026, in compliance with SEBI Regulation 31(1)(b).
Bondada Engineering SME to Main Board Migration
Bondada Engineering received NSE in-principle approval to migrate from BSE SME to NSE Main Board. BSE had granted its own approval earlier in September 2026.
Other production started announcements
All →Waaree Energies Production Started
Waaree Solar Americas commenced commercial production of 1.6 GW solar modules at Brookshire, Texas. Total facility capacity now stands at 3.2 GW.
- solar module manufacturing capacity
- 1600 MW
Studds Accessories Production Started
Studds Accessories commenced commercial production at its Manufacturing Facility-V in Faridabad on October 30, 2026, after receiving Consent to Operate. No capacity or monetary value was disclosed.
NTPC Green Energy Production Started
NTPC Green Energy's subsidiary declared commercial operations for 95.6 MW of its Kalasar Solar Energy Project effective October 30, 2026.
- solar capacity
- 95.6 MW
NTPC Production Started
NTPC's subsidiary NVVN declared its first 250 MW / 500 MWh BESS project commercial from 27 October 2026, with power scheduling starting 28 October. This is a commercial operation start for a new energy storage asset.
- battery energy storage capacity
- 250.0 MW
DCM Shriram Production Started
DCM Shriram announced full commissioning of its ~68 MW wind-solar hybrid renewable power project. The project is held through SPV JSW Renew Energy Thirty Two Limited.
- wind-solar hybrid renewable power capacity
- 68.0 MW
Subros Production Started
Subros commenced commercial production at its new greenfield HVAC and Hose & Tubes plant. The 4.5 lakh units/annum capacity required ₹150 Crore investment.
- Value
- ₹150.0 Cr
- HVAC and Hose & Tubes / air-conditioning system production capacity
- 450000 units per annum