BSE filing, NSE: BIGBLOC. Summary written from the filing by ALFA Finder's alert engine.
Bigbloc Construction Ltd: key numbers
- Share price
- ₹36.06
- Market cap
- ₹510.5 Cr
- Revenue (annual)
- ₹283.4 Cr
- Net profit (annual)
- ₹-1.76 Cr
- P/E (TTM)
- 297.9×Sector 32.2×
- Promoter holding
- 72.81%+0.00% QoQ
- FII holding
- 0.21%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Bigbloc Construction Ltd
All →Bigbloc Construction Board Meeting Date
Bigbloc Construction intimated that its Board meeting is scheduled for 3 November 2026 to approve Q2 FY27 results. No financial figures are disclosed in this advance notice.
Bigbloc Construction IPO
Bigbloc Construction intimates its subsidiary BBEL's board approved a proposed IPO of equity shares. No size, price, or timeline has been determined yet.
Bigbloc Construction Other Announcement
Bigbloc Construction Ltd filed its quarterly shareholding pattern for the period ended September 30, 2026, as required under SEBI Regulation 31(1)(b).
Bigbloc Construction Annual General Meeting
Bigbloc Construction Limited conducted its 11th Annual General Meeting on August 25, 2026. Shareholders considered the adoption of financial statements and approved material related-party transactions.
Bigbloc Construction Merger & Restructuring
Bigbloc Construction's subsidiary, Bigbloc Building Elements Private Limited, received shareholder approval to convert into a public company. The conversion remains subject to regulatory formalities and fresh incorporation.
Bigbloc Construction Investor Presentation: Key Takeaways
BigBloc Construction reported Q1-FY27 revenue of INR 791 Mn with 7.96% EBITDA margin. Strategy focuses on expanding AAC block capacity and diversifying into wall panels and construction chemicals.
Other production started announcements
All →Gala Precision Engineering Production Started
Gala Precision Engineering commissioned a 1.20 MW open access solar plant at Nanded on October 30, 2026. The plant will supply captive power to its manufacturing facility.
- solar power capacity
- 1.2 MW
Waaree Energies Production Started
Waaree Solar Americas commenced commercial production of 1.6 GW solar modules at Brookshire, Texas. Total facility capacity now stands at 3.2 GW.
- solar module manufacturing capacity
- 1600 MW
Studds Accessories Production Started
Studds Accessories commenced commercial production at its Manufacturing Facility-V in Faridabad on October 30, 2026, after receiving Consent to Operate. No capacity or monetary value was disclosed.
NTPC Green Energy Production Started
NTPC Green Energy's subsidiary declared commercial operations for 95.6 MW of its Kalasar Solar Energy Project effective October 30, 2026.
- solar capacity
- 95.6 MW
NTPC Production Started
NTPC's subsidiary NVVN declared its first 250 MW / 500 MWh BESS project commercial from 27 October 2026, with power scheduling starting 28 October. This is a commercial operation start for a new energy storage asset.
- battery energy storage capacity
- 250.0 MW
DCM Shriram Production Started
DCM Shriram announced full commissioning of its ~68 MW wind-solar hybrid renewable power project. The project is held through SPV JSW Renew Energy Thirty Two Limited.
- wind-solar hybrid renewable power capacity
- 68.0 MW