| Execution period | Expiring in CY 2030 |
|---|
NSE filing, NSE: AZAD. Summary written from the filing by ALFA Finder's alert engine.
Azad Engineering Ltd: key numbers
- Share price
- ₹2,577.40
- Market cap
- ₹16,645 Cr
- Revenue (annual)
- ₹603.0 Cr
- Net profit (annual)
- ₹132.9 Cr
- P/E (TTM)
- 119.8×Sector 52.2×
- Promoter holding
- 55.84%+0.00% QoQ
- FII holding
- 12.70%Current quarter
Reference market data from a third-party provider, updated daily. Not a valuation or a recommendation.
More from Azad Engineering Ltd
All →Azad Engineering Other Announcement
The company filed its quarterly shareholding pattern for the period ended September 30, 2026, as per standard SEBI disclosure requirements.
Azad Engineering Bags ₹52.68 Cr Order from Bharat Heavy Electricals Limited
Azad Engineering secured a two-year BHEL rate contract worth about ₹52.68 crore for gas turbine airfoils. The disclosure marks its growing role in domestic power equipment.
- Value
- ₹52.68 Cr
- From
- Bharat Heavy Electricals Limited (BHEL)
- Execution
- Two years, to be executed by October 9, 2028
Azad Engineering Management Change
Azad Engineering Limited shareholders approved the re-appointment of Mr. Rakesh Chopdar, Mrs. Jyoti Chopdar, and Mr. Vishnu Malpani as Whole-Time Directors for five-year terms.
- Execution
- 5 years
Azad Engineering Annual General Meeting
Azad Engineering Limited held its 43rd Annual General Meeting on September 29, 2026. The meeting transacted ordinary and special business, including director appointments and remuneration approvals.
Azad Engineering Capacity Expansion
AZAD Engineering inaugurated two exclusive lean manufacturing facilities in Hyderabad for GE Vernova's Gas Power business. These state-of-the-art centers expand the company's dedicated footprint to three facilities.
- From
- GE Vernova
- lean manufacturing facilities
- 2.0 plants
Azad Engineering Other Announcement
Azad Engineering is sending letters to shareholders lacking registered email IDs, providing a weblink to access the 43rd AGM notice and FY 2025-26 Annual Report.
Other new order win announcements
All →Siyaram Recycling Industries Bags ₹3.09 Cr Order from Sahjanand Impex
Siyaram Recycling secured a Rs. 3.09 Crore order from Sahjanand Impex for Brass Scrap Honey. Execution is due within 20 days.
- Value
- ₹3.09 Cr
- From
- Sahjanand Impex
- Execution
- Within 20 Days
RailTel Corporation of India Bags ₹22.78 Cr Order from Department Of Posts
RailTel received a Letter of Acceptance from Department of Posts for GPU Compute and Storage services. The Rs. 22.78 Crore order covers a 5-year OPEX execution period.
- Value
- ₹22.78 Cr
- From
- Department Of Posts
- Execution
- 5 years
Dilip Buildcon Bags ₹688.2 Cr Order from National Highways Authority of India
Dilip Buildcon received a Rs. 688.23 Crore LOA from NHAI for a 9.66 km Solapur elevated corridor. Construction spans 24 months with a 15-year operation period.
- Value
- ₹688.2 Cr
- From
- National Highways Authority of India
- Execution
- 24 Months (construction) + 15 years (operation from COD)
- elevated corridor length
- 9.66 km
Jupiter Wagons Bags ₹1,140 Cr Order from Ministry of Railways
Jupiter Wagons secured an order for 2,583 BOXNHL and BOXNS wagons worth ₹1,140 crore from the Ministry of Railways. This reinforces its position in railway rolling stock manufacturing.
- Value
- ₹1,140 Cr
- From
- Ministry of Railways (Railway Board)
ACME Solar Holdings Bags New Order from NTPC Limited
ACME Solar's subsidiary signed a PPA with NTPC for a 400 MW FDRE project. Supply is scheduled to start by June 2028, with a 25-year tenure.
- From
- NTPC Limited
- Execution
- Scheduled Commencement of Supply Date 30.06.2028; project tenure 25 years from SCSD
- FDRE power project contracted capacity
- 400.0 MW
Zaggle Prepaid Ocean Services Bags New Order from AGP City Gas Private Limited
Zaggle Prepaid Ocean Services will provide its Zaggle Propel platform to AGP City Gas under a one-year agreement. Fees depend on active users and redeemed vouchers, so no contract value is disclosed.
- From
- AGP City Gas Private Limited
- Execution
- 1 year